Architecture dpt.
ECOLE ACTIVE
OBJECT TRANSFORMATION AND EXTENSION OF THE SECONDARY SCHOOL FROM A 192-STUDENT CAPACITY INTO A 580-STUDENT CAPACITY WITH SPORTSHALL
LOCATION RUE DE STALLE - 1180 UCCLE
PHASE ACHIEVED
CLIENT ECOLE ACTIVE ASBL
PARTNERS POLY-TECH ENGINEERING - SOLIPROM - VENAC - SURMESUR
This project includes the renovation and extension with the new construction of the sport hall by laminated timber (CLT) and KIELSTEG which will be equipped with lockers, changing rooms and bathroom facilities on 865 m² of surface, plus development of the courtyard.
The school has registered 96 students on September 2014 and it is expected to enlarge its capacity by 96 students every year until 2020 to reach the prospect number of 576-student capacity.
PRESS
https://www.ecobuild.brussels/fr/professionnel/news/construire-en-clt-que-des-avantages
https://www.ecobuild.brussels//nl/professionneel/news/clt-bouw-alleen-maar-voordelen
http://www.ecobuild.brussels/fr/professionnel/news/les-avantages-de-la-construction-bois
© 2020 by ÁRTER Architects
The contents contained in this website are copyright protected.
No person may download, duplicate, reproduce, edit or publish any content contained in whole or in part without prior written permission of ÁRTER Architects.